1.1
Purpose of the Report
1.2
Structure of the Report
2.1
Background
2.2
General Site Description
2.3
Major Activities Undertaken
2.4
Project Organisation and
Management Structure
2.5
Status of Environmental
Approval Documents
3
Environmental
Monitoring and Audit Requirements
3.1
Environmental Monitoring
3.1.1
Air Quality
3.1.2
Odour
3.2
Site Audit
3.2.1
Water Quality
3.2.2
Landscape and
Visual
4.1
Air Quality
4.1.1
Operation Phase
Monitoring
4.2
Odour
4.2.1
Operation Phase
Monitoring
4.3
Water Quality
4.3.1
Operation Phase
Monitoring
4.4
Waste Management
4.4.1
Operation Phase
Monitoring
5.1
Environmental Site Audit
5.1.1
Operation Phase
5.2
Landscape and Visual Audit
6
Environmental
Non-conformance
6.1
Summary of Environmental
Non-Compliance
6.2
Summary of Environmental
Complaint
6.3
Summary of Environmental
Summon and Successful Prosecution
7.1
Key Issues for the Coming
Reporting Period
LIST
OF TABLES
Table 2.1 Summary of Activities Undertaken in
the Reporting Period
Table 2.2 Summary of Environmental Licensing, Notification and
Permit Status
Table 3.1 Sampling and Laboratory Analysis
Methodology
Table 3.2 Emission Limit for CAPCS Stack
Table 3.3 Emission Limit for CHP Stack
Table 3.4 Emission Limit for ASP Stack
Table 3.5 Emission Limit for Standby Flaring
Gas Unit)
Table 3.6 Odour Intensity Level
Table 3.7 Action and Limit Levels for Odour
Nuisance
Table 3.8 Event and Action Plan for Odour
Monitoring
Table 4.1 Hourly Average of Parameters Recorded for CAPCS
Table 4.2 Hourly Average of Parameters
Recorded for CHP 1
Table 4.3 Hourly Average of Parameters
Recorded for CHP 2
Table 4.4 Hourly Average of Parameters
Recorded for CHP 3
Table 4.5 Hourly Average of Parameters
Recorded for ASP
Table 4.6 Hourly Average of Parameters Recorded for the Standby
Flaring Gas Unit
Table 4.7 Results of the Discharge Sample
Collected from the Effluent Storage Tank in March 2022
Table 4.8 Results of the Discharge Sample
Collected from the Effluent Storage Tank in April 2022
Table 4.9 Results of the Discharge Sample
Collected from the Effluent Storage Tank in May 2022
Table 4.10 Results of the Discharge Sample from the Petrol
Interceptor 1 on 13 April 2022
Table 4.11 Results of the Discharge Sample from the Petrol
Interceptor 2 on 13 April 2022
Table 4.12 Quantities of Waste Generated from
the Operation of the Project
Table 8.1 Exceedances for Stack Emissions
LIST
OF ANNEXES
Annex E
Environmental complaint, Environmental Summons and Prosecution Log |
The
construction works of No. EP/SP/61/10 Organic Resources Recovery Centre
Phase 1 (the Project) commenced on 21 May 2015. This is the 28th
quarterly Environmental Monitoring and Audit (EM&A) report presenting
the EM&A works carried out during the period from 1 March 2022 to 31 May
2022 in accordance with the EM&A Manual. Substantial completion of the
construction works was confirmed on 3 December 2018. In the meantime, the
operation phase EM&A programme had commenced in March 2019.
Substantial Completion in respect of substantial part of the Works was
confirmed on 24 February 2020. The construction phase EM&A programme
was completed in the end of February 2020.
Summary
of Works undertaken during the Reporting Month
Works
undertaken in the reporting month included:
·
Operation of the Project, including organic waste
reception, and operation of the pre-treatment facilities, anaerobic digesters,
composting facilities, air pollution control systems, on-line emission
monitoring system for the Centralised Air Pollution Control Unit (CAPCS),
Co-generation Units (CHP)s and Ammonia Stripping Plant (ASP), and the
wastewater treatment plant; and
·
Process fine-tune, including adjustment of the ASP
with new treatment media, modification of Continuous Environmental Monitoring
System (CEMS) and Supervisory Control and Data Acquisition System (SCADA)
rectification and improvement works following equipment failures and the
alteration of different operation modes and measures to adapt to the high
variation of SSOW nature and sources.
·
Servicing (included adjusting of some of the operating
parameters, valve check/adjustment, cable plug connection, ignition timing,
spark plug checking, etc.) of the CHP2; and
·
Modification of the ASP (included upgrading of the
exhaust blower of the economizer, modification of the blower, motor, ducts and
pipework and trials using various operation parameters to improve the
performance of the equipment) to control the air emission.
Environmental
Monitoring and Audit Progress
Air Quality Monitoring
Exceedances
on SO2 and NOx from CHPs and CO, NOx, SO2,
VOCs, NH3 and HF from ASP were recorded on the on-line monitoring
system from March 2022 to May 2022. It should be noted that measurements
recorded under abnormal operating conditions, e.g. start up and stopping of stacks
and unstable operation, as well as test runs and interference of sensor, are
disregarded.
In March 2022,
the exceedance of SO2 from CHP1 occurred due to malfunctioning of an
instrument (blower) of the de-sulphurisation system. The exceedance of
CO, NOx, VOCs and NH3 from ASP occurred due to system
instability caused by leakage of the internal tubing of the economiser.
In April 2022, the exceedances of SO2 from CHP 1, 2 and ASP occurred
due to malfunctioning of an instrument (blower) of the de-sulphurisation
system. The exceedances of NOx from CHP 3 occurred due to unstable system
caused by leakage in the CHP 3. The exceedance of CO, NOx,
VOCs and NH3 from ASP occurred due to system instability caused by
motor overheating, unstable water flow and leakage of pump. In May 2022,
the exceedances of SO2 from CHPs and the ASP occurred due to
tripping of the de-sulphurisation system caused by the failure of one of the
columns of the system. The exceedances of NOx from CHP 3 in early
May 2022 occurred due to insufficient feedstock. The exceedance of CO, NOx,
VOCs, NH3 and HF from ASP occurred due to system instability caused
by the ongoing performance optimisation of the ASP, resulting in a lowered
temperature of the system and the incomplete combustion of biogas.
The
Contractor has implemented mitigation measures to control the exceedance
(including replacement of malfunctioned parts (desulphurisation system, columns
of the ASP), cleaning for various parts (i.e. stripping column and packaging of
the ASP), and carried out fine-tuning of equipment of the ASP).
The
Contractor is recommended to closely monitor the processes of the modification
of the ASP and the post-modification monitoring of emission level to avoid any
exceedance.
As
similar issues have been re-occurred for sometimes, the Contractor is advised
to undertake a comprehensive review of the operation of the concerned systems
and the effectiveness of the existing mitigation measures and proposed further
measures to avoid the exceedance.
Odour
No
odour patrol was required to be conducted for this reporting period.
Water Quality
No
non-compliance to the effluent discharge limit stipulated in the discharge
licence issued by the EPD under the Water Pollution Control Ordinance was
recorded during this reporting period.
Waste Management
Waste
generated from the operation of the Project includes chemical waste, waste
generated from pre-treatment process and general refuse.
1,240
L of chemical waste was collected by licenced waste collector from the
operation of the Project.
862.14
tonnes of waste generated from pre-treatment process from the operation of the
Project was disposed of at landfill. Among the recyclable waste generated
from pre-treatment process from the operation of the Project, 0.00 tonnes of
metals, 0.00 tonnes of papers/ cardboard packing and 0.00 tonnes of plastics
were sent to recyclers for recycling during the reporting period.
Around
7.94 tonnes of general refuse from the operation of the Project was disposed of
at landfill. Among the recycled general refuse from the operation of the
Project, 0.00 tonnes of metals, 0.00 tonnes of papers/ cardboard packing and
0.00 tonnes of plastics were sent to recyclers for recycling during the
reporting period.
Findings
of Environmental Site Audit
A summary of the monitoring activities undertaken in
this reporting period is listed below:
·
Joint Environmental Site Inspections |
3 times |
·
Landscape & Visual Inspections |
3 times |
Monthly joint environmental site inspections were
carried out. The environmental control/ mitigation measures (related to
air quality, water quality, waste (including land contamination prevention),
hazard-to-life and landscape and visual) recommended in the approved EIA Report
and the EM&A Manual were properly implemented by the Contractor during the
reporting month.
Environmental
Exceedance/Non-conformance/Compliant/Summons and Prosecution
Exceedances
for the air emission limits for the CHP and ASP stacks were recorded during the
reporting period.
No
complaint/ summon/prosecution was received in this reporting period.
Future
Key Issues
Activities
to be undertaken in the next reporting month include:
·
Operation of the Project;
·
Maintenance of CHP 2 (i.e. replacement of cylinder
head) and modification of the ASP (i.e. repairing of economizer’s heat
exchanger, mixing units and diesel generator) to control the air emission; and
·
Cleaning of the Suspension Buffer Tank.
ERM-Hong Kong, Limited (ERM) was
appointed by OSCAR Bioenergy Joint Venture (the Contractor) as the
Environmental Team (ET) to undertake the construction Environmental Monitoring
and Audit (EM&A) programme for the Contract No. EP/SP/61/10 of
Organic Waste Treatment Facilities Phase I, which the project name has
been updated to Organic Resources Recovery Centre (Phase I) (the Project) since November 2017.
ERM was also appointed by the Contractor to undertake the operation EM&A
programme starting 1 March 2019.
This is the 28th
Quarterly EM&A report which summarises the monitoring results and audit
findings for the EM&A programme during the reporting period from 1 March
2022 to 31 May 2022.
The structure of the report is as
follows:
Section 1: Introduction
It details the
scope and structure of the report.
Section
2: Project Information
It
summarises the background and scope of the Project, site description, project
organisation and status of the Environmental Permits (EP)/licences.
Section
3: Environmental Monitoring and Audit Requirements
It summarises
the environmental monitoring requirements including monitoring parameters,
programmes, methodologies, frequency, locations, Action and Limit Levels,
Event/Action Plans, as well as environmental audit requirements as recommended
in the EM&A Manual and approved EIA report.
Section
4: Monitoring Results
It summarises
monitoring results of the reporting period.
Section
5: Site Audit
It summarises
the audit findings of the environmental as well as landscape and visual site
audits undertaken within the reporting period.
Section
6: Environmental Non-conformance
It summarises
any exceedance of environmental performance standard, environmental complaints
and summons received within the reporting period.
Section
7: Further Key Issues
It summarises
the impact forecast for the next reporting month.
Section
8: Conclusions
The Organic Resources Recovery
Centre (ORRC) Phase I development (hereinafter referred to as “the Project”) is
to design, construct and operate a biological treatment facility with a
capacity of about 200 tonnes per day and convert source-separated organic waste
from commercial and industrial sectors (mostly food waste) into compost and
biogas through proven biological treatment technologies. The location of
the Project site is shown in Annex
A.
The environmental acceptability
of the construction and operation of the Project had been confirmed by findings
of the associated Environmental Impact Assessment (EIA) Study completed in
2009. The Director of Environmental Protection (DEP) approved this EIA
Report under the Environmental Impact Assessment Ordinance (EIAO) (Cap.
499) in February 2010 (Register No.: AEIAR-149/2010) (hereafter referred to as the approved EIA Report).
Subsequent Report on Re-assessment on Environmental Implications and Report on
Re-assessment on Hazard to Life Implications were completed in 2013,
respectively.
An Environmental Permit
(EP) (No. EP-395/2010) was issued by
the DEP to the EPD (Project Team), the Permit Holder, on 21 June 2010 and
varied on 18 March 2013 (No. EP-395/2010/A) and 21 May 2013 (No.
EP-395/2010/B), respectively. The Design Build and Operate Contract for
the ORRC Phase 1 (Contract No. EP/SP/61/10 Organic Resources Recovery Centre
(Phase 1) (the Contract)) was awarded to SITA Waste Services Limited, ATAL
Engineering Limited and Ros-Roca, Sociedad Anonima
jointly trading as the OSCAR Bioenergy Joint Venture (OSCAR or the
Contractor). A Further EP (No. FEP-01/395/2010/B) was issued by the DEP
to the OSCAR on 16 February 2015. Variation to both EPs (Nos.
EP-395/2010/B and FEP-01/395/2010/B) were made in December 2015. The
latest EPs, Nos. EP-395/2010/C and FEP-01/395/2010/C, were issued by the DEP on
21 December 2015.
Under the requirements
of Condition 5 of the EP (No. FEP-01/395/2010/C), an Environmental Monitoring
and Audit (EM&A) programme as set out in the approved EM&A Manual
(hereinafter referred to as EM&A Manual) is required to be implemented
during the construction and operation of the Project. ERM-Hong Kong, Ltd
(ERM) has been appointed by OSCAR as the Environmental Team (ET) for the
construction phase EM&A programme and the Monitoring Team (MT) for the
operation phase EM&A programme for the implementation of the EM&A programme
in accordance with the requirements of the EP and the approved EM&A Manual.
The
construction works commenced on 21 May 2015. The operation phase of the
EM&A programme commenced on 1 March 2019 ([1]). The
construction phase EM&A programme was completed in the end of February
2020.
The Project Site is located at Siu
Ho Wan in North Lantau with an area of about 2 hectares. The layout of
the Project Site is illustrated in Annex A. The facility received an average of
115.12 to 136.07 tonnes and treated an average of 106.93 to 124.62 tonnes of
source separated organic waste per day during the reporting month.
A summary of the major activities
undertaken in the reporting period is shown in Table 2.1.
Table 2.1
Summary of Activities Undertaken in the Reporting Period
Activities Undertaken in the Reporting Period |
·
Systems being operated – waste reception,
pre-treatment, CAPCS extraction, the digesters, the centrifuge, the
composting tunnels, the desulphurisation, the emergency flare, the CHPs, the
ASP and the biological waste water treatment plant (about 115.12 – 136.07 t/d
SSOW input); and ·
Process fine-tune – adjustment of the ASP
operational parameters with new treatment media, CEMS/SCADA modification and
improvement work following equipment failures and the alteration of different
operation modes and measures to adapt to the high variation of SSOW nature
and sources; ·
Servicing (included adjusting of some of the operating
parameters, valve check/adjustment, cable plug connection, ignition timing,
spark plug checking, etc.) of the CHP2; and ·
Modification of the ASP (included upgrading of the
exhaust blower of the economizer, modification of the blower, motor, ducts
and pipework and trials using various operation parameters to improve the
performance of the equipment) to control the air emission. |
The project organisation chart and
contact details are shown in Annex
B.
A summary of the valid permits,
licences, and/or notifications on environmental protection for this Project is
presented in Table 2.2.
Table
2.2
Summary of Environmental Licensing, Notification and Permit Status
Permit/
Licences/ Notification |
Reference |
Validity
Period |
Remarks |
Environmental
Permit |
FEP-01/395/2010/C |
Throughout the
Contract |
Permit granted
on 21 December 2015 |
Notification
of Construction Works under the Air Pollution Control (Construction Dust)
Regulation |
Ref No. 386715 |
Throughout the
Contract |
- |
Effluent
Discharge License |
WT00038391-2021 |
7 July 2021 –
30 June 2026 |
Approved on 7
July 2021 |
Chemical Waste
Producer Registration |
WPN
5213-961-O2231-01 |
Throughout the
Contract |
Approved on 29
April 2015 |
Chemical Waste Producer Registration |
WPN 5213-961-O2231-02 |
Throughout the Contract |
Approved on 10 November 2017 |
Waste Disposal
Billing Account |
Account
number: 702310 |
Throughout the
Contract |
- |
The air quality
(including odour) monitoring to be carried out during the operation phase of
the Project are described below. Although water quality monitoring is not
required for the operation phase under the EM&A programme, there are water
quality monitoring requirement under the Water Discharge Licence of the plant
under the Water Pollution Control Ordinance (WPCO). As part of
this EM&A programme, the monitoring results will be reviewed to check the
compliance with the WPCO requirements.
According to the EM&A Manual
and EP requirements, stack monitoring are required during the operation phase
of the Project.
On-line monitoring (using
continuous environmental monitoring system (CEMS) shall be carried out for the
centralised air pollution unit (CAPCS), cogeneration units (CHP) and the
ammonia stripping plant (ASP) during the operation phase. The last
calibration was carried out in January 2023.
The monitoring data is transmitted
instantaneously to EPD (Regional Office) by telemetry system.
When the on-line monitoring for
certain parameter cannot be undertaken, monitoring will be carried out using
the following methodology approved by the EPD.
Table 3.1
Sampling and Laboratory Analysis Methodology
Parameters |
Method |
Stacks to be
Monitored |
Gaseous and vaporous organic
substances (including methane) |
USEPA Method 18 |
·
CAPCS ·
CHP ·
ASP |
Particulate |
USEPA Method 5 |
·
CAPCS ·
CHP ·
ASP |
Carbon monoxide (CO) |
USEPA
Method 10 |
·
CHP ·
ASP |
Nitrogen oxides (NOx) |
USEPA Method 7E |
·
CHP ·
ASP |
Sulphur dioxide (SO2); |
USEPA Method 6 |
·
CHP ·
ASP |
Hydrogen chloride (HCl) |
USEPA Method 26A |
·
CHP ·
ASP |
Hydrogen fluoride (HF) |
USEPA Method 26A |
·
CHP ·
ASP |
Oxygen (O2); |
USEPA Method 3A |
·
CAPCS ·
CHP ·
ASP |
Velocity and Volumetric Flow |
USEPA Method 2 |
·
CAPCS ·
CHP ·
ASP |
Ammonia (NH3) |
USEPA CTM 027 |
·
ASP |
Odour (including NH3
and H2S) |
EN 13725 |
·
CAPCS |
Water vapour content (continuous
measurement of the water vapour content should not be required if the sample
exhaust gas is dried before the emissions are analysed) |
USEPA Method 4 |
·
CAPCS ·
CHP ·
ASP |
Temperature |
USEPA Method 4 |
·
CAPCS ·
CHP ·
ASP |
With reference to the EM&A
Manual, the air emission of the stacks shall meet the following emission limits
as presented in Tables 3.2 to 3.5.
Table 3.2
Emission Limit for CAPCS Stack
Parameter |
Emission Level
(mg/Nm3) (a) |
VOCs (including methane) |
680 |
Dust (or Total Suspended Particulates (TSP)) |
6 |
Odour (including NH3 & H2S) |
220 (b) |
Notes: (a)
Hourly average concentration (b)
The odour unit is OU/Nm3 |
Table 3.3
Emission Limit for CHP Stack
Parameter |
Maximum Emission
Level (mg/Nm3) (a) (b) |
Dust (or Total Suspended
Particulates) |
15 |
Carbon Monoxide |
650 |
NOx |
300 |
SO2 |
50 |
NMVOCs (c) |
150 |
VOCs
(including methane) (d) |
1,500 |
HCl |
10 |
HF |
1 |
Notes: (a)
All values refer to an oxygen content in the exhaust gas of 6% and dry basis. (b)
Hourly average concentration (c)
NMVOCs should be monitored by gas sampling and laboratory analysis at an
agreed interval. For the first 12 months (starting from August 2019),
monitoring should be carried out at quarterly intervals. The monitoring
frequency should then be reduced to half-yearly for next 12 months (starting
from August 2020). (d)
The VOCs emission limit include methane as biogas is adopted as fuel in the
combustion process. |
Table 3.4
Emission Limit for ASP Stack
Parameter |
Maximum Emission Level
(mg/Nm3) (a) (b) |
Dust (or Total Suspended Particulates) |
5 |
Carbon Monoxide |
100 |
NOx |
200 |
SO2 |
50 |
VOCs
(including methane) (c) |
20 |
NH3 |
35 |
HCl |
10 |
HF |
1 |
Notes: (a)
All values refer to an oxygen content in the exhaust gas of 11% and dry
basis. (b)
Hourly average concentration (c)
The VOCs emission limit include methane as biogas is adopted as fuel in the
combustion process. |
Table
3.5 Emission Limit for Standby
Flaring Gas Unit ([2])
Parameter |
Maximum Emission
level (mg/Nm3) (a) (b) |
Dust (or Total Suspended
Particulates) |
5 |
Carbon Monoxide |
100 |
NOx |
200 |
SO2 |
50 |
VOCs (including methane) (c) |
20 |
HCl |
10 |
HF |
1 |
Notes: (a) All
values refer to an oxygen content in the exhaust gas of 11% and dry basis. (b)
Hourly average concentration (c)
The VOCs emission limit include methane as biogas is adopted as fuel in the
combustion process. |
To
determine the effectiveness of the proposed odour mitigation measures and to
ensure that the operation of the ORRC1 will not cause adverse odour impacts,
odour monitoring of the CAPCS stack (see Section 3.1.1) and odour patrol
will be carried out.
Odour patrol shall be conducted by
independent trained personnel/ competent persons in summer months (i.e. from
July to September) for the first two operational years of ORRC1 at monthly
intervals along an odour patrol route at the Project Site boundary as shown in Annex A.
The perceived odour intensity is
divided into 5 levels. Table 3.6 describes the odour intensity for
different levels.
Table 3.6
Odour Intensity Level
Level |
Odour Intensity |
0 |
Not detected. No odour perceived
or an odour so weak that it cannot be easily
characterised or described |
1 |
Slight identifiable odour,
and slight chance to have
odour nuisance |
2 |
Moderate identifiable
odour, and moderate chance to have odour nuisance |
3 |
Strong identifiable, likely
to have odour nuisance |
4 |
Extreme severe odour,
and unacceptable odour level |
Table 3.7
shows the action level and limit level to be used for odour patrol. Should any
exceedance of the action and limit levels occurs, actions in accordance with
the event and action plan in Table 3.8 should be carried out.
Table 3.7
Action and Limit Levels for Odour Nuisance
Parameter |
Action Level |
Limit Level |
Odour Nuisance (from odour
patrol) |
When one documented compliant is
received (a), or Odour Intensity of 2 is measured from odour patrol. |
Two or more documented complaints
are received (a) within a week; or Odour intensity of 3 or above is measured
from odour patrol. |
Note: (a)
Once the complaint is received by the Project Proponent (EPD), the Project
Proponent would investigate and verify the complaint whether it is related to
the potential odour emission from the ORRC1 and its on-site wastewater
treatment unit. |
Table 3.8
Event and Action Plan for Odour Monitoring
Event |
Action |
|
|
Person-in-charge of Odour Monitoring |
Project Proponent (a) |
Action Level |
|
|
Exceedance of action level (Odour
Patrol) |
1. Identify source/reason of
exceedance; 2. Repeat odour patrol to confirm
finding. |
1. Carry out investigation to
identify the source/reason of exceedance. Investigation should be
completed within 2 weeks; 2. Rectify any unacceptable
practice; 3. Implement more mitigation
measures if necessary; 4. Inform Drainage Services
Department (DSD) or the operator of the Siu Ho Wan Sewage Treatment Works
(SHWSTW) if exceedance is considered to be caused by the operation of the
SHWSTW. 5. Inform North Lantau Refuse
Transfer Station (NLTS) operator if exceedance is considered to be caused by
the operation of NLTS. |
Exceedance of action level (Odour
Complaints) |
1. Identify source/reason of
exceedance; 2. Carry out odour patrol to
determinate odour intensity. |
1. Carry out investigation and
verify the complaint whether it is related to potential odour emission from
the nearby SHWSTW; 2. Carry out investigation to
identify the source/reason of exceedance. Investigation should be completed
within 2 weeks; 3. Rectify any unacceptable
practice; 4. Implement more mitigation
measures if necessary; 5. Inform DSD or the operator of
the SHWSTW if exceedance is considered to be caused by the operation of the
SHWSTW. 6. Inform NLTS operator if
exceedance is considered to be caused by the operation of NLTS. |
Limit Level |
|
|
Exceedance of limit level |
1. Identify source/reason of
exceedance; 2. Inform EPD; 3. Repeat odour patrol to
confirm findings; 4. Increase odour patrol
frequency to bi-weekly; 5. Assess effectiveness of
remedial action and keep EPD informed of the results; 6. If exceedance stops, cease
additional odour patrol. |
1. Carry out investigation to
identify the source/reason of exceedance. Investigation should be
completed within 2 week; 2. Rectify any unacceptable
practice; 3. Formulate remedial actions; 4. Ensure remedial actions
properly implemented; 5. If exceedance continues,
consider what more/enhanced mitigation measures should be implemented; 6. Inform DSD or the operator of
the SHWSTW if exceedance is considered to be caused by the operation of the
SHWSTW. |
Note: (a)
Project Proponent shall identify an implementation agent. |
Environmental mitigation measures
(related to air quality, water quality, waste, land contamination,
hazard-to-life, and landscape and visual) to be implemented during the
operation phase of the Project are recommended in the approved EIA Report and
EM&A Manual and are summarised in Annex C. Monthly site audits for operation phase
will be carried out to check the implementation of these measures.
Compliance audits are to be
undertaken to ensure that a valid discharge licence has been issued by EPD
prior to the discharge of effluent from the operation of the Project
site. Under Effluent Discharge Licence WT00038391-2021 (effective from
July 2021), the effluent quality shall meet the discharge limits as described
in Table 3.9 and Table 3.10.
Table 3.9
Discharge Limits for Effluent from the Effluent Storage Tank (as
stipulated in WT00038391-2021)
Parameters |
Discharge Limit
(mg/L) |
Flow Rate (m3/day)
(a) |
645 |
pH (pH units) (b) |
6-10 (c) |
Suspended Solids (b) |
800 |
Biochemical Oxygen Demand (5
days, 20°) (b) |
800 |
Chemical Oxygen Demand (b) |
2,000 |
Oil & Grease (b) |
40 |
Total Nitrogen (b) |
200 |
Total Phosphorus (b) |
50 |
Surfactants (total) (b) |
25 |
Notes: (a) Flow
rate is not a parameter required to be monitored and reported by the
Contractor in accordance to Section B2 of the Effluent Discharge Licence
under the WPCO. (b)
Parameters required to be monitored and reported by the Contractor in
accordance to Section B2 of the Effluent Discharge Licence under the WPCO.
(c)
Range. |
Table 3.10
Discharge Limits for Effluent from the Petrol Interceptor(s) (as
stipulated in WT00038391-2021)
Parameters |
Discharge Limit
(mg/L) |
Flow Rate (m3/day)
|
245 (a) |
Suspended Solids (b) |
30 |
Chemical Oxygen Demand (c) |
80 |
Oil & Grease (c) |
20 |
Surfactants (total) (b) |
15 |
Notes: (a) The
surface runoff flow rate limit was estimated by the overall yearly rainfall
data. As the actual flowrate from the petrol interceptors depends on
the weather condition instead of the performance of the petrol interceptor,
monitoring and reporting of this parameter is not required. Hence this
parameter is not reported in Table 4.10. and Table 4.11. (b)
Parameter not required to be reported in accordance to Section B2 of the
Effluent Discharge Licence under the WPCO. (c)
Parameters required to be reported in accordance to Section B2 of the
Effluent Discharge Licence under the WPCO. |
In accordance with EM&A Manual,
the landscape and visual mitigation measures shall be implemented.
For operation phase, site
inspection shall be conducted once a month for the first year of operation of
the Project. All measures as stated in the implementation schedule of the
EM&A Manual (see Annex C),
including compensatory planting, undertaken by both the Contractor and the
specialist Landscape Sub-Contractor during the first year of the operation
phase shall be audited by a Registered Landscape Architect (RLA) to ensure
compliance with the intended aims of the measures and the effectiveness of the
mitigation measures.
The concentrations of concerned air
pollutants emitted from the stacks of the CAPCS, CHP, and ASP during the
reporting period are monitored on-line by the continuous environmental
monitoring system (CEMS). During the reporting period, the standby flare
operated on 14, 19, 20 April and 10 and 30 May 2022.
With reference to the emission
limits shown in Tables 3.2, 3.3 and 3.4, the hourly average
concentrations and the number of exceedances of the concerned air emissions
monitored for the CAPCS, CHP, ASP and the Standby Flaring Gas Unit during this
reporting period are presented in Tables 4.1 to 4.5.
It should be noted that
measurements recorded under abnormal operating conditions, e.g. start up and
stopping of stacks and unstable operation, as well as test runs and
interference of sensor, are disregarded.
Table 4.1
Hourly Average of Parameters Recorded for CAPCS
Parameter |
Range of Hourly
Average Conc. (mg/Nm3) |
Emission Limit
(mg/Nm3) |
Exceedance
Identified |
Remarks |
VOCs (including
methane) |
0.00
– 533.48 |
680 |
Nil |
Nil |
Dust (or TSP) |
0.00
– 0.02 |
6 |
Nil |
Nil |
Odour (including NH3 & H2S) (a) |
0.00
– 180.17 |
220 |
Nil |
Nil |
Note: (a)
The odour unit is OU/Nm3. |
Table 4.2
Hourly Average of Parameters Recorded for CHP 1
Parameter |
Range
of Hourly Average Conc. (mg/Nm3) (a) |
Max.
Emission Limit (mg/Nm3) |
Exceedance Identified |
Remarks |
Dust
(or TSP) |
0 - 12 |
15 |
Nil |
Nil |
Carbon
Monoxide |
0 - 639 |
650 |
Nil |
Nil |
NOx |
0 - 300 |
300 |
Nil |
Nil |
SO2 |
0
- 297 (c) |
50 |
Identified (c) |
De-sulphurisation system tripped
/ Under Maintenance |
VOCs
(including methane) (b) |
0
- 1,037 |
1,500 |
Nil |
Nil |
HCl |
0
- 3 |
10 |
Nil |
Nil |
HF |
0
- 1 |
1 |
Nil |
Nil |
Notes: (a) All
values refer to an oxygen content in the exhaust gas of 6% and
dry basis. (b) The
VOCs emission limit include methane as biogas is adopted as fuel in the
combustion process. (c)
Dates with exceedances on SO2 (number of exceedance on the day)
were identified on 25 (1) March 2022; 5 (1), 10 (16), 11 (13), 12
(2) and 15 (4) April 2022; 16
(6), 17 (1), 18 (1), 19 (10), 20 (24), 21 (24), 22 (4), 24 (6), 25 (1), 27
(4), 28 (8), 29 (3) and 30 (4) May 2022. |
Table 4.3
Hourly Average of Parameters Recorded for CHP 2
Parameter |
Range of Hourly Average
Conc. (mg/Nm3) (a) |
Max. Emission Limit
(mg/Nm3) |
Exceedance Identified |
Remarks |
Dust (or TSP) |
0 – 12 |
15 |
Nil |
Nil |
Carbon Monoxide |
0 – 629 |
650 |
Nil |
Nil |
NOx |
0 – 300 |
300 |
Nil |
Nil |
SO2 |
0 – 308 |
50 |
Identified (c) |
De-sulphurisation system tripped
/ Under Maintenance |
VOCs
(including methane) (b) |
0 – 800 |
1,500 |
Nil |
Nil |
HCl |
0 – 1 |
10 |
Nil |
Nil |
HF |
0 – 1 |
1 |
Nil |
Nil |
Notes: (a) All
values refer to an oxygen content in the exhaust gas of 6% and
dry basis. (b) The VOCs
emission limit include methane as biogas is adopted as fuel in the combustion
process. (c)
Dates with exceedances on SO2 (number of exceedance on the day)
were identified on 10 (5), 11 (13) and 15 (4) April 2022; 10 (4), 16 (1), 17
(9), 18 (21), 19 (22), 20 (22), 21 (11), 24 (11), 25 (16), 26 (24), 27 (24),
28 (22), 29 (19), 30 (24) and 31 (18) May 2022. |
Table 4.4
Hourly Average of Parameters Recorded for CHP 3
Parameter |
Range of Hourly
Average Conc. (mg/Nm3) (a) |
Max. Emission Limit
(mg/Nm3) |
Exceedances Identified |
Remarks |
Dust (or TSP) |
0 – 15 |
15 |
Nil |
Nil |
Carbon Monoxide |
0 – 605 |
650 |
Nil |
Nil |
NOx |
0 – 440 |
300 |
Identified (c) |
System unstable (e.g. low
efficiency, unstable column temperature ) |
SO2 |
0 – 427 |
50 |
Identified (d) |
Desulpurisation system tripped / Under Maintenance |
VOCs
(including methane) (b) |
0 – 1,149 |
1,500 |
Nil |
Nil |
HCl |
0 – 3 |
10 |
Nil |
Nil |
HF |
0 – 1 |
1 |
Nil |
Nil |
Notes: (a)
All values refer to an oxygen content in the exhaust gas of 6% and dry basis. (b)
The VOCs emission limit include methane as biogas is adopted as fuel in the
combustion process. (c)
Dates
with exceedances on NOx (number of exceedances on the day) were identified on
4 (1), 21 (6), 22 (12), 23 (22), 24 (18), 25 (13), 26 (15), 28 (3), 29 (7)
and 30 (23) April 2022; and 1 (1) May 2022. (d) Date
with exceedances on SO2 (number of exceedance on the day) was identified on 1
(1), 3 (1), 10 (4), 13 (1), 14 (22), 15 (18), 16 (3), 17 (16), 18 (24), 19
(12), 22 (21), 23 (24), 24 (18), 25 (18), 26 (22), 27 (16), 28 (15), 29 (19),
30 (20) and 31 (17) May 2022 . |
Table 4.5
Hourly Average of Parameters Recorded for ASP
Parameter |
Range
of Hourly Average Conc. (mg/Nm3) (a) |
Max. Emission Limit
(mg/Nm3) |
Exceedances Identified |
Remarks |
Dust (or TSP) |
0 – 5 |
5 |
Nil |
Nil |
Carbon Monoxide |
0 – 1,046 |
100 |
Identified (c) |
System unstable (e.g. low
efficiency, unstable column temperature ) |
NOx |
0 – 541 |
200 |
Identified (d) |
System unstable (e.g. low
efficiency, unstable column temperature ) |
SO2 |
0 – 323 |
50 |
Identified (e) |
Desulpurisation system tripped |
VOCs
(including methane) (b) |
0 – 1,486 |
20 |
Identified (f) |
System unstable (e.g. low
efficiency, unstable column temperature ) |
NH3 |
0 – 229 |
35 |
Identified (g) |
System unstable (e.g. low
efficiency, unstable column temperature ) |
HCl |
0 – 4 |
10 |
Nil |
Nil |
HF |
0 – 2 |
1 |
Identified (h) |
System unstable (e.g. low
efficiency, unstable column temperature ) |
Notes: (a) All
values refer to an oxygen content in the exhaust gas of 11% and dry basis. (b) The VOCs
emission limit include methane as biogas is adopted as fuel in the combustion
process. (c)
Date with exceedances on CO (number of exceedances on the day) were identified
on 8 (1),
13 (1) and 27 (1) March 2022; 18 (1) April 2022; 20 (1) May 2022. (d) Date
with exceedances on NOx (number of exceedances on the day) were identified
on 1 (1), 3 (1), 4 (1), 6 (2), 7 (2), 8 (8), 13 (1), 14 (6), 15 (3), 16 (6),
17 (3), 24 (4), 25 (7), 27 (1), 28 (1) and 31 (4) March 2022; 1 (1), 2 (2), 5
(4), 8 (2), 9(8), 11 (7), 12 (6), 14 (4), 15 (4), 16 (5), 17 (12), 19 (10),
20 (10), 21 (3), 22 (5), 26 (1), 27 (3), 28 (4) and 29 (4) April 2022; 1 (2),
2 (2), 3 (2), 5 (9), 8 (18), 9 (10), 10 (5), 11 (7), 12 (19), 13 (15), 14
(20), 17 (2), 18 (5), 19 (11), 20 (1), 21 (5), 22 (7), 23 (2), 25 (4), 27
(3), 28 (5), 29 (14) and 30 (4) May 2022. (e) Dates
with exceedances on SO2 (number of exceedances on the day) were
identified on 6 (1) March 2022; 5 (3), 10 (16), 11 (9), 12 (2), 15 (5) and 28
(1) April 2022; 13 (8), 14 (23), 15 (24), 16 (24), 17 (24), 18 (24), 19 (18),
20 (23), 21 (24), 22 (18), 23 (24), 24 (24), 25 (23), 26 (24), 27 (23), 28
(20), 29 (15), 30 (18) and 31 (5) May 2022. (f)
Dates with exceedances on VOCs (number of exceedances on the day) were identified
on 13 (1) March 2022; 16 (1), 18 (1), 28 (1) and 29 (1) April 2022; 20 (1),
28 (1) and 29 (2) May 2022. (g) Dates
with exceedances on NH3 (number of exceedances on the day) were
identified on 2 (3), 3 (5), 4 (1), 6 (1), 8 (2), 12 (2), 13 (7), 14 (2), 16
(4), 17 (5), 24 (1), 25 (4), 26 (7), 27 (2), 28 (1), 30 (2) and 31 (4) March
2022; 3 (1), 6 (6), 8 (1), 9 (1), 11 (1), 12 (8), 13 (6), 17 (3), 18 (2), 21
(2), 23 (2), 28 (2) and 29 (1) April 2022; 3 (9), 5 (1), 15 (4), 17 (4), 18
(2), 20 (1), 22 (5), 23 (2) and 26 (6) May 2022. (h) Dates
with exceedances on HF (number exceedances on the day) were identified on 5
(2) and 22 (2) May 2022. |
Table 4.6
Hourly Average of Parameters Recorded for the Standby Flaring Gas Unit
Parameter |
Range
of Hourly Average Conc. (mg/Nm3) (a)(c) |
Max. Emission Limit
(mg/Nm3) |
Exceedances Identified |
Remarks |
Dust (or TSP) |
0 – 0 |
5 |
Nil |
Nil |
Carbon Monoxide |
0 – 0 |
100 |
Nil |
Nil |
NOx |
0 – 19 |
200 |
Nil |
Nil |
SO2 |
0 – 30 |
50 |
Nil |
Nil |
VOCs (including
methane) (b) |
0 – 17 |
20 |
Nil |
Nil |
HCl |
0 – 1 |
10 |
Nil |
Nil |
HF |
0 – 1 |
1 |
Nil |
Nil |
Notes: (a) All
values refer to an oxygen content in the exhaust gas of 11% and dry basis. (b) The VOCs
emission limit include methane as biogas is adopted as fuel in the combustion
process. (c)
During the reporting period, the standby flare operated on 14, 19 and 20
April 2022; 10 and 30 May 2022 |
No odour patrol was required to be
conducted for this reporting period.
Effluent discharge was sampled from
the outlet chamber of the Effluent Storage Tank monthly and from the Petrol
Interceptor(s) bi-monthly as stipulated in the operation phase discharge
licence. The results of the discharge samples from the outlet chamber of the
Effluent Storage Tank are recorded in Table 4.7 to 4.9 and the results from the
Petrol Interceptors are recorded in Table 4.10 and Table 4.11.
Table 4.7
Results of the Discharge Sample Collected from the Outlet Chamber of the
Effluent Storage Tank in March 2022
Parameters |
Discharged Effluent
Concentration (mg/L) |
Discharge Limit
(mg/L) |
Compliance with
Discharge Limit |
Flow Rate (m3/day)
(a) |
0
- 281 (e) |
645 |
Yes |
pH (pH units) (b) |
7.60
– 8.27 (e) |
6-10 (c) |
Yes |
Suspended Solids (b) (d) |
76
(d) |
800 |
Yes |
Biochemical Oxygen Demand (5
days, 20°) (b) (d) |
34
(d) |
800 |
Yes |
Chemical
Oxygen Demand (b) (d) |
760
(d) |
2,000 |
Yes |
Oil & Grease (b) (d) |
<5 (d) |
40 |
Yes |
Total Nitrogen (b) (d) |
77.3
(d) |
200 |
Yes |
Total Phosphorus (b) (d) |
20.2
(d) |
50 |
Yes |
Surfactants (total) (b) (d) |
5.5
(d) |
25 |
Yes |
Notes: (a)
Parameter not required to be reported in accordance to Section B2 of the
Effluent Discharge Licence under the WPCO. (b)
Parameters required to be reported in accordance to Section B2 of the
Effluent Discharge Licence under the WPCO. (c)
Daily Range. (d)
Effluent sample collected on 30 March 2022. (e) Data collected daily in the reporting month. |
Table 4.8
Results of the Discharge Sample Collected from the Outlet Chamber of the
Effluent Storage Tank in April 2022
Parameters |
Discharged Effluent Concentration
(mg/L) |
Discharge Limit
(mg/L) |
Compliance with
Discharge Limit |
Flow Rate (m3/day)
(a) |
34
- 244 (e) |
645 |
Yes |
pH (pH units) (b) |
7.69
– 8.08 (e) |
6-10 (c) |
Yes |
Suspended Solids (b) (d) |
75
(d) |
800 |
Yes |
Biochemical Oxygen Demand (5
days, 20°) (b) (d) |
29
(d) |
800 |
Yes |
Chemical
Oxygen Demand (b) (d) |
756
(d) |
2,000 |
Yes |
Oil & Grease (b) (d) |
<5 (d) |
40 |
Yes |
Total Nitrogen (b) (d) |
50.2
(d) |
200 |
Yes |
Total Phosphorus (b) (d) |
18.1
(d) |
50 |
Yes |
Surfactants (total) (b) (d) |
<1.0
(d) |
25 |
Yes |
Notes: (a) Parameter not required to be reported in accordance to Section B2
of the Effluent Discharge Licence under the WPCO. (b) Parameters required to be reported in accordance to Section B2 of
the Effluent Discharge Licence under the WPCO. (c) Daily Range. (d) Effluent sample collected on 22 April 2022. (e) Data collected daily in the reporting month. |
Table 4.9
Results of the Discharge Sample Collected from the Outlet Chamber of the
Effluent Storage Tank in May 2022
Parameters |
Discharged Effluent
Concentration (mg/L) |
Discharge Limit
(mg/L) |
Compliance with
Discharge Limit |
Flow Rate (m3/day)
(a) |
7
– 303 (e) |
645 |
Yes |
pH (pH units) (b) |
7.30
– 8.10 (e) |
6-10 (c) |
Yes |
Suspended Solids (b) (d) |
148
(d) |
800 |
Yes |
Biochemical Oxygen Demand (5
days, 20°) (b) (d) |
33
(d) |
800 |
Yes |
Chemical
Oxygen Demand (b) (d) |
939
(d) |
2,000 |
Yes |
Oil & Grease (b) (d) |
<5 (d) |
40 |
Yes |
Total Nitrogen (b) (d) |
116
(d) |
200 |
Yes |
Total Phosphorus (b) (d) |
28.0
(d) |
50 |
Yes |
Surfactants (total) (b) (d) |
1.4 (d) |
25 |
Yes |
Notes: (a) Parameter not required to be reported in accordance to Section B2
of the Effluent Discharge Licence under the WPCO. (b) Parameters required to be reported in accordance to Section B2 of
the Effluent Discharge Licence under the WPCO. (c) Daily Range. (d) Effluent sample collected on 19 May 2022. (e) Data collected daily in the reporting month. |
Table 4.10
Results of the Discharge Sample from the Petrol Interceptor 1 on 13
April 2022
Parameters |
Discharged
Effluent Concentration (mg/L) |
Discharge
Limit (mg/L) |
Compliance
with Discharge Limit |
Suspended
Solids (b) |
<2 (a) |
30 |
Yes |
Chemical
Oxygen Demand (c) |
<5 (a) |
80 |
Yes |
Oil
& Grease (c) |
<5
(a) |
20 |
Yes |
Surfactants
(total) (b) |
<1.0
(a) |
15 |
Yes |
Notes: (a)
Effluent sample collected on 13 April 2022. (b) Parameter
not required to be reported in accordance to Section B2 of the Effluent
Discharge Licence under the WPCO. (c)
Parameters required to be reported in accordance to Section B2 of the
Effluent Discharge Licence under the WPCO. |
Table
4.11 Results of the
Discharge Sample from the Petrol Interceptor 2 on 13 April 2022
Parameters |
Discharged
Effluent Concentration (mg/L) |
Discharge
Limit (mg/L) |
Compliance
with Discharge Limit |
Suspended
Solids (b) |
<2
(a) |
30 |
Yes |
Chemical
Oxygen Demand (c) |
<5
(a) |
80 |
Yes |
Oil
& Grease (c) |
<5
(a) |
20 |
Yes |
Surfactants
(total) (b) |
<1.0
(a) |
15 |
Yes |
Notes: (a)
Effluent sample collected on 13 April 2022. (b) Parameter
not required to be reported in accordance to Section B2 of the Effluent
Discharge Licence under the WPCO. (c)
Parameters required to be reported in accordance to Section B2 of the
Effluent Discharge Licence under the WPCO. |
No non-compliance of discharge
limit of all parameters from Petrol Interceptor 1 and 2 was recorded during the
reporting period.
Wastes generated from the operation
of the Project include chemical waste, wastes generated from pre-treatment
process and general refuse ([3]).
Reference has been made to the Monthly Summary Waste Flow Table prepared by the
Contractor (see Annex D).
With reference to the relevant handling records and trip tickets of this
Project, the quantities of different types of waste generated from the
operation of the Project in the reporting month are summarised in Table 4.12.
Table 4.12
Quantities of Waste Generated from the Operation of the Project
Month / Year |
Chemical Waste |
Waste Generated from
|
General Refuse |
||
|
Disposal of at CWTC
|
Disposed of at
Landfill (a) |
Recycled (b)
|
Disposed of at
Landfill (a) (c) |
Recycled (d)
|
March 2022 |
0 L |
253.75
tonnes |
0.00 tonnes |
2.65 tonnes |
0.00 tonne |
April 2022 |
1,240 L (e) |
253.45 tonnes |
0.00 tonnes |
2.53 tonnes |
0.00 tonne |
May 2022 |
0 L |
354.94
tonnes |
0.00 tonnes |
2.76
tonnes |
0.00
tonne |
Notes: (a)
Waste generated from pre-treatment process and general refuse
other than chemical waste and recyclables were disposed of at NENT landfill
by sub-contractors. (b)
Among waste generated from pre-treatment process, 0.00 tonne of metals, 0.00
tonne of papers/ cardboard packing and 0.00 tonne of plastics were sent to
recyclers for recycling during the reporting period. (c)
It was assumed that four 240-litre bins filled with 80% of general refuse
were collected at each collection. The general refuse density was
assumed to be around 0.15 kg/L. (d)
Among general refuse, 0.00 tonnes of metals, 0.00 tonnes of papers/ cardboard
packing and 0 tonnes of plastics were sent to recyclers for recycling during
the reporting period. (e)
It included 20 L of spent acid, 1,200 L of spent lube oil, 20 L of spent
alkaline material. |
The
monthly inspections of the operation phase of the Project covered the operation
phase environmental site inspections. The inspections checked the
implementation of the recommended mitigation measures for air quality,
landscape and visual, water quality, waste (land contamination) and
hazard-to-life stated in the Implementation Schedule (see Annex C).
Follow-up
actions resulting from the site inspections were generally taken as reported by
the Contractor. The Contractor has implemented environmental mitigation
measures recommended in the approved EIA Report and EM&A Manual.
March
2022
The
monthly inspection of the operation phase of the Project on 11 March 2022
covered the operation phase environmental site audit. Joint site
inspections was conducted by representatives of the Contractor, IEC and the MT
on 11 March 2022 as required for the operation of the Project.
April
2022
The
monthly inspection of the operation phase of the Project on 8 April 2022 covered
the operation phase environmental site audit. Joint site inspections was
conducted by representatives of the Contractor, IEC and the MT on 8 April 2022
as required for the operation of the Project.
May
2022
The
monthly inspection of the operation phase of the Project on 20 May 2022 covered the
operation phase environmental site audit. Joint site inspections was
conducted by representatives of the Contractor, IEC and the MT on 20 May 2022 as required
for the operation of the Project.
It was confirmed that the necessary
landscape and visual mitigation measures during the operation phase as
summarised in Annex C
were generally implemented by the Contractor. No non-compliance in
relation to the landscape and visual mitigation measures was identified during
the site audits in this reporting period and therefore no further actions are
required. The ET/MT will keep track of the EM&A programme to check
compliance with environmental requirements and the proper implementation of all
necessary mitigation measures.
March 2022
Monthly inspection of the landscape and visual mitigation measures for
the operation phase of the Project was performed on 11 March 2022.
April 2022
Monthly inspection of the landscape and visual mitigation measures for
the operation phase of the Project was performed on 8 April 2022.
May 2022
Monthly inspection of the landscape and visual mitigation measures for
the operation phase of the Project was performed on 20 May 2022.
March 2022
Non-compliance of emission limits of SO2 from CHP 1 and CO,
NOx, VOCs and NH3 from ASP were recorded during the
reporting period.
The Contractor has reviewed the organic waste treatment processes (i.e.
waste reception, waste pre-treatment, anaerobic digesters, and composting
processes) and found that they were operated normally during the reporting
period. The Contractor has investigated the de-sulphurisation system and the
ASP, the potential causes for the exceedance were identified.
The exceedances of SO2 from CHP 1 occurred due to
malfunctioning of the control instrument. A blower within the de-sulphurisation
system was tripped and immediate maintenance work was carried out by on-site
maintenance team and the issue was fixed on the same day.
The exceedance of CO, NOx, VOCs and NH3 from ASP
occurred due to system instability caused by leakage of the internal tubing of
the economiser. The Contractor arranged urgent maintenance to the structure.
The ASP has been under continuous upgrading work throughout the reporting
month.
The investigation reports of the
above exceedance are presented in Annex F.
April 2022
Non-compliance of emission limits of SO2 and NOx
from the CHPs and CO, NOx, SO2, VOCs and NH3 from
ASP were recorded during the reporting period.
The Contractor has reviewed the organic waste treatment processes (i.e.
waste reception, waste pre-treatment, anaerobic digesters, and composting
processes) and found that they were operated normally during the reporting
period. The Contractor has investigated the de-sulphurisation system and the
ASP, the potential causes for the exceedance were identified.
The exceedances of SO2 from CHP 1, 2 and ASP occurred due to
tripping of the de-suphurisation system caused by
malfunctioning of a blower. Immediate maintenance work and filter cleaning was
carried out. The issue was fixed on the same day. The exceedances of NOx
occurred due to unstable system caused by leakage in the CHP 3. The issues was
temporarily fixed and the situation will be monitored continuously by the
Contractor.
The exceedance of CO, NOx, VOCs and NH3 from ASP
occurred due to system instability caused by motor overheating, unstable water
flow and leakage of pump. The Contractor arranged urgent maintenance to the
affected system and upgrading works are on-going.
The investigation reports of the above exceedance are presented in Annex F.
May 2022
Non-compliance of emission limits of SO2 from the CHPs, NOx
from CHP3 and CO, NOx, SO2, VOCs, NH3 and HF
from ASP were recorded during the reporting period.
The Contractor has reviewed the organic waste treatment processes (i.e.
waste reception, waste pre-treatment, anaerobic digesters, and composting
processes) and found that they were operated normally during the reporting
period. The Contractor has investigated the de-sulphurisation system, CHPs and
the ASP, the potential causes for the exceedance were identified.
The exceedances of SO2 from CHPs and ASP occurred due to
tripping of the de-sulphurisation system caused by failure of one of the
columns. The Contractor inspected the column and the pipes and pumps of the
systems when exceedance and malfunctioning of the system were observed.
Isolation of the affected system and maintenance of the columns were carried
out and the performance of the system resumed to normal in late-May 2022.
Activated carbon filter will be replaced in the coming reporting period to improve
the SO2 removal efficiency.
The exceedances of NOx from CHP 3 in early May 2022 occurred
due to insufficient feedstock. The exceedance of CO, NOx, VOCs, NH3
and HF from ASP occurred due to system instability caused by the ongoing
performance optimisation of the ASP, resulting in a lowered temperature of the
system and the incomplete combustion of biogas. The Contractor will continue to
carry out maintenance and optimisation measures to restore the combustion
efficiency so that the concerned pollutants will be effectively destroyed.
The investigation reports of the above exceedance are presented in Annex F.
Activities to be undertaken for the
coming reporting period are:
·
Operation of the Project; and
·
Cleaning of the suspension Buffer Tank.
This EM&A Report presents the
EM&A programme undertaken during the reporting period from 1 March 2022 to
31 May 2022 in accordance with EM&A Manual (Version F) and
requirements of EP (FEP-01/395/2010/C).
For the operation phase,
exceedances of the emission limits for stack monitoring (including CAPCS, CHP
and ASP stacks) were recorded under normal operating conditions during the
reporting period (see Table 8.1).
Table 8.1
Exceedances for Stack Emissions
Stack |
Exceedances During
the Reporting Period |
Centralised Air Pollution
Control Unit (CAPCS) |
·
Nil |
Cogeneration Unit (CHP) 1 |
·
Exceeded
mission limit of SO2 on 25 March 2022; 5, 10, 11, 12 and 15 April
2022; 6, 17, 18, 19, 20, 21, 22, 24, 25, 27, 28, 29 and 30 May 2022. |
Cogeneration Unit (CHP) 2 |
·
Exceeded
emission limit of SO2 on 10, 11 and 15 April 2022; 10, 16, 17, 18,
19, 20, 21, 24, 25, 26, 27, 28, 29, 30 and 31 May 2022. |
Cogeneration Unit (CHP) 3 |
·
Exceeded
emission limit of NOx on 4, 21, 22, 23, 24, 25, 26, 28, 29 and 30
April 2022; 1 May 2022. ·
Exceeded
emission limit of SO2 on 1, 3, 10, 13, 14, 15, 16, 17, 18, 19, 22,
23, 24, 25, 26, 27, 28, 29, 30 and 31 May 2022. |
Ammonia Stripping Plant (ASP) |
·
Exceeded
emission limit of CO on 8, 13 and 27 March 2022; 18 April 2022; 20 May 2022. ·
Exceeded
emission limit of NOx on 1, 3, 4, 6, 7, 8, 13, 14, 15, 16, 17, 24,
25, 27, 28 and 31 March 2022; 1, 2, 5, 8, 9, 11, 12, 14, 15, 16, 17, 19, 20,
21, 22, 26, 27, 28 and 29 April 2022; 1, 2, 3, 5, 8, 9, 10, 11, 12, 13, 14,
17, 18, 19, 20, 21, 22, 23, 25, 27, 28, 29 and 30 May 2022. ·
Exceeded
emission limit of SO2 on 5, 10, 11, 12, 15 and 28 April 2022; 13,
14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30 and 31 May
2022. ·
Exceeded
emission limit of VOCs on 13 March 2022; 16, 18, 28 and 29 April 2022; 20, 28
and 29 May 2022. ·
Exceeded
emission limit of NH3 on 2, 3, 4, 6, 8, 12, 13, 14, 16, 17, 24,
25, 26, 27, 28, 30 and 31 March 2022; 3, 6, 8, 9, 11, 12, 13, 17, 18, 21, 24,
28 and 29 April 2022; 3, 5, 15, 17, 18, 20, 22, 23 and 26 May 2022. ·
Exceeded
emission limit of HF on 5 and 22 May 2022. |
In March 2022, the
exceedances of SO2 from CHP 1 and CO, NOx, VOCs and NH3
from ASP were recorded during the reporting period. The exceedances of SO2
from CHP 1 occurred due to malfunctioning of an instrument (blower) of the de-sulphurisation system. The exceedance of CO, NOx,
SO2, VOCs and NH3 from ASP occurred due to system instability
caused by the leakage of the internal tubing of the economiser
of the ASP.
In April 2022, the
exceedances of SO2 from CHP 1, 2 and CO, NOx, SO2,
VOCs and NH3 from ASP were recorded during the reporting period. The
exceedances of SO2 from CHP 1, 2 and ASP occurred due to
malfunctioning of an instrument (blower) of the de-sulphurisation system. The
exceedances of NOx from CHP 3 occurred due to unstable system caused
by leakage in the CHP 3. The exceedance of CO, NOx, VOCs and NH3
from ASP occurred due to system instability caused by motor overheating,
unstable water flow and leakage of pump.
In May 2022, non-compliance of emission limits of SO2 from
the CHPs, NOx from CHP 3 and CO, NOx, SO2,
VOCs, NH3 and HF from ASP were recorded during the reporting period.
The exceedances of SO2 from CHPs and the ASP occurred due to
tripping of the de-sulphurisation system caused by the failure of one of the
columns of the system. The exceedances of NOx from CHP 3 in early
May 2022 occurred due to insufficient feedstock. The exceedance of CO, NOx,
VOCs, NH3 and HF from ASP occurred due to system instability caused
by the ongoing performance optimisation of the ASP, resulting in a lowered
temperature of the system and the incomplete combustion of biogas.
The Contractor has replaced and
maintained the malfunctioned parts (desulphurisation system, columns of the
ASP, air blower), cleaning for various parts (i.e. stripping column and
packaging of the ASP, air blow’s filter), reinstalled the ASP feed pump, and carried
out fine-tuning of equipment of the ASP, the investigation on the underlying
reasons of exceedances in CHP and ASP and the continuous seeking of better and
more feedstock to increase biogas loading and testing at ASP to optimise
combustion efficiency and overall performance.
No non-compliance to the effluent
discharge limit was recorded during this reporting period.
The environmental control
/mitigation measures related to air quality, water quality, waste (including
land contamination prevention), hazard-to-life and landscape and visual
recommended in the approved EIA Report and the EM&A Manual were properly
implemented by the Contractor during the reporting period.
Monthly landscape and visual
monitoring were conducted in the reporting period. The necessary
landscape and visual mitigation measures recommended in the approved EIA Report
were generally implemented by the Contractor.
No complaint/summon/prosecution was
received.
|
|
|
|
([1])
As some of the minor items are yet to be closed out in March
2019, the construction phase EM&A programme and Operation Phase EM&A
programme were undertaking in parallel in March 2019.